Less Than Two Weeks!

The foundation is half done and the floor is being poured tomorrow! The house gets delived on the 13th! T has been working his ass off to get things done. We’ve had a lot of setbacks (like the flooding rains this weekend while we were laying block!) and a lot of the things we planned on having done are not done. The well will be put in after the house is set. T should hopefully be starting on the septic as soon as the foundation is done. It’s crazy to me everytime I go to the property to see how much as changed. Just six months ago we were cutting down trees. I still have a hard time believing it’s really happening. This is something we’ve been talking about almost as long as we’ve been together, so to see everything actually come to fruition is pretty unbelievable.